LOGO SOUTH COUNTRY PROGRAMMA South Africa.
ZELFBOUW
(INTEGRATED PLAN FOR COMMUNITY BUILDING)
1. Background
In 2002 the City of Tshwane has set as goal
The elimination of the housing backlog in the Tshwane
area within the period of ten years.
The residents of Tshwane will positively be engaged
in the development of their areas
This Sub-project proposal is oriented by these two
general goals. It is also based on previous activities between Delft and
Tshawne, including a seminar organized by DUT
(2003) oriented to improve People Driven Programs through the revision
of international experiences. [1]
This Integrated Plan for a Community Building Program
consists of a Pilot Project for a new type of housing schemes including
monitoring and training activities. The program will integrate two different
forms of housing delivery. The labour intensive construction methods for the
services and the main structures (casco), and the work of the organized
community for the finishing, extension
and improvement of their top structures. It is believe that these actions will
help to reduce backlog and potentiate peoples participation since it is meant
to contribute to employment, while supplying a significant advance in the
quality of the housing stock and the community and urban lifestyle.
2 Local
problem description.
There is a great need in Tshwane for social houses,
especially in the townships Mamelodi and Nelmapius.
3. Actors and targetgroups.
City of Tshwane, department
of housing
City of Delft, will build a
community centre in this project
Technical University of
Delft, dep. Bouwkunde gives technical support.
4. Objective of the project.
Pilot
Project General Objective:
The general objective is to improve housing
conditions of low income segments.
Specific Objectives:
Pilot
Project Strategy:
The area is situated to the east of Pretoria City
centre within the boundaries of Mamelodi.
The area falls within the jurisdiction area of the
Administrative Unit manager of Pretoria.
The project area and thus the area identified for the
self-help scheme is situated in Mamelodi Extension 5 (Stand 29 355). The stand
is 6,1846 ha in extent and should house approximately 250 individual
residential stands with a ruling stand size of 100 m ², one community stand of
0,275 ha and one business stand of 2 250 m ². (Annexure A)
The Stand 29 355 was selected as the site for the
proposed integrated community program scheme, initiated as a partnership
project between the City of Tshwane and Delft in the Netherlands.
The stand is bordered by a primary school to the south,
residential stands next to the K69 road to the east, Tashane street to the west
and Shilovhane street to the north.
Tshawne Municipality. Housing Division- Eugene van de
Berg and Implementation team for RSP and PDP
Delft side: Delft Municipality and the Delft
University of Technology. Department of Urbanism.
Pilot
Project Activities:
Activity 1
Setting a preliminary design for a housing unit that
takes into consideration the positive attributes of the 30m2 (RSP 0-1500) and avoid the negative
experiences of the 36m2 program of the self-build unit, according to the
concept ‘guided-introvert- progressive growth’. The Plan introduces the need of
a Community Centre with a multipurpose goal of supplying community space for
activities which are not able to be perform in family houses (weddings,
funerals, eventual national days celebration) and to serve for capacity
building, crèche and community services. The definitive location and design of
the CC in the stand 29455 will take place in this preliminary sketch of the
general plan.
This phase includes the identification and comparison
of the efficiency of the various design and scales of building activities
(house types, urban design, master plan)
Identification of target household according to
existing waiting list procedures Starting the building of the Community Centre
(CC).
Activity 3
Starting the Training of Trainers program for
capacity building. The training is oriented to community participation,
especially in housing issues and community programs.
Activity 4
The elaboration of the definitive Master Plan for the
29355 stands, engineering plan based in norms and regulations of the CCT
Housing Division and the consultation with the community.
The Delft monitoring will take the form of a Seminar
which will take place in Tshwane.
Expected
Pilot Project results.
Activity 5
Organizing the Tendering for the First Phase
o
The Developer is chosen and the Building work started
Activity 6
Community Capacity Building program.
Activity 7
Construction Phase 1.
Consist of a construction of the first 50 houses
The responsible of the coordination of the four
action is the Housing Division…..
Activity 8
Feed Back
A Feed Back operation will be made at the end of the
first phase when all community members are occupying their houses for at least
one month.
Activity 9
Construction of the Second Phase.
The construction of about 250 houses is expected.
Resulting from the feed back and assessment of the first 50 houses. It will be improved
the housing units of previous phase according to the reports.
Activity
10
Assessment and Policy Recommendation of the Pilot
Project
A Final Seminar for the total evaluation of the
Integrated Community Building Process.
Plan Time Scheme
ACTIVITY |
1st semester |
2nd semester |
3rd semester |
4th semester |
5th semester |
6th semester |
|||||||||||||||||||
1 |
Preliminary
Plan-urban design-housing and CC |
1X |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2 |
Selecting
Users from Waiting list |
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Starting
building Community Center |
|
x |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 |
Training
of Trainers |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4 |
Master
Plan consultation with the community |
|
|
|
x |
X |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Delft
monitoring |
|
|
|
x |
X |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5 |
Tendering
procedures First Phase (50 houses) |
|
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6 |
Capacity
Building:
|
|
|
|
|
x |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DELFT
Monitoring Inauguration
CC |
|
|
|
|
|
|
X |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7 |
Construction
1st Phase 50 houses |
|
|
|
|
|
x |
x |
x |
x |
x |
x |
|
|
|
|
|
|
|
|
|
|
|
|
|
8 |
Feed
Back |
|
|
|
|
|
|
|
|
|
|
|
x |
|
|
|
|
|
|
|
|
|
|
|
|
9 |
Construction
2nd Phase |
|
|
|
|
|
|
|
|
|
|
|
|
x |
x |
x |
x |
x X |
x |
x |
x |
x |
x |
|
|
10 |
Policy
Recommendations |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
x |
x |
X
meeting in Delft X
training in Delft 2 Tshwane experts X Delft Training-Monitoring (in Tshwane)
X
work in Tshwane X
workshop in Tshwane 2 Delft experts
6. Expected results.
Phase 1 (2006) :
Building of the community centre and 35-50 houses.
Phase 2 (2007) :
Building of 80 houses
Phase 3 (2008) :120 houses.
And Empowerment of the communityin the fields of
administration, technical management and participation. Participative training
of trainers in managing community building at low-cost.
7. Indicators.
As above mentioned (7), in 2008 experience and skill will be developed, which will make it possible to start other projects all over Tshwane.
8. Risk
and durability analysis.
External factors:
Changing political climate
Finances and cooperation with different parties
Cultural aspects.
9. Evaluation/monitoring
and reporting.
The projectmanagement is in hands of the University
of Delft and the building department of the city of Tshwane, which will report
to the city of Delft every three months.
Preliminary
Map
_
Budget
Number activity |
Name Activity |
Unit |
Number of Units |
Cost of the Unit |
Total cost |
1 |
Trip of Tshwane counterpart EvdB |
trip |
1 |
1000 |
1000 |
Day perdiem |
7 days |
150 |
1050 |
||
2 |
Selection future household and starting CC |
trip |
2 |
1000 |
2000 |
Day perdiem |
14 days |
100 |
1400 |
||
3 |
Trainning Trainers |
trip |
2 |
1000 |
2000 |
Day perdiem |
42 days |
150 |
6300 |
||
4 |
Monitoring Master Plan 3Delft experts to Tshawne |
trip |
3 |
1000 |
3000 |
Day perdiem |
21 days |
100 |
2100 |
||
5 |
Tendering |
|
|
|
|
|
|
|
|
||
6 |
Capacity Building:
Office Equipment Instructive Workplaces: Wood Steel Pre-fab Concrete |
|
|||
Laptop & beamer |
gl |
gl |
2000 |
||
|
|||||
gl |
gl |
gl |
20000 |
||
|
|
|
|
||
6 |
Delft Monitoring 3 Delft experts to Tshwane |
trip |
3 |
1000 |
3000 |
Day perdiem |
21 |
100 |
2100 |
||
7 |
Construction of 50 houses |
|
|
|
|
7 |
Monitoring : 2 Delft experts |
trip |
2 |
1000 |
2000 |
Day perdiem |
30 |
100 |
3000 |
||
8 |
Feed Back POE seminar |
trip |
2 |
1000 |
2000 |
|
|
Day perdiem |
30 |
100 |
3000 |
9 |
Construction 200 houses |
trip |
4 |
1000 |
4000 |
|
|
Day perdiem |
30 |
100 |
3000 |
10 |
Policy recommendation & Project Difussion |
trip |
4 |
1000 |
4000 |
|
Seminar |
Day perdiem |
30 |
100 |
3000 |
|
GRAND TOTAL |
|
|
|
69.950 Euros |